Why is the monitoring and controlling phase extremely important to the success of the project

Respuesta :

zdgzr
zdgzr zdgzr
  • 22-01-2020

Answer: It is the only way to ensure that work plan estimates are on track and that early intervention can take place.

Explanation: APEX

Answer Link

Otras preguntas

Haryati had 1250 oranges. She gave away 242 oranges. She packed the rest of the oranges equally into of 8. She sold all the bags at $3 each.
President Eisenhower believed in the domino theory as it applied to world politics wich held that
Business documents can include all of the following except ____.
PLEASE HELP!! Which of the following choices is a valid argument? A. Cassandra owns a Mercedes Benz.  Rich people drive Mercedes Benz.  Therefore, Cassandra mu
Match the philosopher with his Ideas achievements or events in his life Aristotle
Does the equation x2 - 4x + y2 = -3 intersect the x-axis?
Which was not a motivation for European exploration in the fifteenth and sixteenth centuries? Question options: A) the promise of trade with Asia B) the de
What happens to the area when the perimeter of square efgh efgh is doubled? explain.answers?
A human gene has 5 alleles. how many heterozygous genotypes are possible? 5 correct answer 10 15 20 25
calculate the volume of each of the following cubes whose side length is given. Show all your working.