Ibbythe8356 Ibbythe8356
  • 04-05-2019
  • Social Studies
contestada

When planning your week the first thing to consider about each activity that your scheduling is its priority level?

Respuesta :

RyleeCanaan12 RyleeCanaan12
  • 04-05-2019

Answer:

yes

Explanation:

i think that if you are going to get things done, than you need to think about how important they are. if something is needed in two weeks, you can save that for later. if something is needed in two or three days, i would do that first. different people have different ways of planning, but that is my opinion

Answer Link

Otras preguntas

What are four physical properties of an orange.
Which organic molecule is responsible for the insulation of internal organs against shock?
Round 125,458 to the nearest hundred thousand
What's a word that means the opposite of shrieked?
A paragraph about physical description with justified opinions
Write an integer to represent the final temperature. The day started out at 6 am as 32 degrees rose 24 degrees by noon and dropped 14 degrees at 6 pm
Ivan said that if a number end in 0 both 2 and 5 are factors of the number. Is he correct?why or why not
What is the evidence that Parliament held the REAL authority in the English constitutional monarchy?
what is 33 %of what number is 1.45
All living things break down _________ to make energy.