​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

Meagan was promoted to vice-president of a major electronics manufacturer. Two days before the promotion, she had given an excellent speech highlighting her man
An earthquake destroys a major manufacturing plant that produces sneakers. the manufacturing plant for rubber, a complementary good to sneakers, is unaffected b
the outer protein coat of a virus is called a
which does a shotgun shell have that a cartridge does not
The lower range of human hearing is approximately _____ hz.
A nurse is reviewing a client's medication history. which drug would the nurse identify as placing the client at risk for ototoxicity?
How is ozone formed in the upper atmosphere?
(9^6/9^5)^2 A. 9^2 B. 9^9 C. 9^3 D. 9^22
Rewrite 0.011 as a fraction in lowest terms. 11/1000 11/100 11/10 11/1
Is gingiva (gum) an organ?