raazshah661 raazshah661
  • 03-09-2020
  • Mathematics
contestada

A can do a piece of work in 20 days and B can do it in 12 days,B work for 9 days,in how many days A alone can do the work​

Respuesta :

roseheart889 roseheart889
  • 03-09-2020

Answer: 9

Step-by-step explanation:

Answer Link

Otras preguntas

The volume of this triangular prism is 95,030 cubic inches. What is the value of m? 85 in 86 in m =
How to control your fear?​
Factor x³ + x² + x + 1 by grouping. What is the resulting expression? ○ (x²)(x + 1) O (x² + 1)(x) O (x² + 1)(x + 1) O (x³ + 1)(x + 1)​
Which statement best describes the results of the Holocaust? A. About 11 million people, including about 6 million Jews, were systematically murdered by the Na
Analyze the word problem and match the vocabulary terms to the chemicals in the word problem. 5.00 grams of solid citric acid is dissolved in 500.00 ml of water
Serenity earned a grade of 39% on her multiple choice science final that had a total of 200 problems. How many problems on the final exam did Serenity answer co
why is it difficult to climb on a mountain through vertical path than a curved path​
Caldo Professional Movers is considering purchasing some new equipment costing $210,000. The equipment will be depreciated on a straight-line basis to a zero bo
Guys, can you please correct my answer for Question #45 of The Quadratic Relations for me, please?
What is that answer to 6 (3/8) - 5 (5/8) ?