medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

Solve the equation: 0.25r - 0.125 + 0.5r =0.5 +r Show all work plz
14. Find the coordinates of the circumcenter for ∆DEF with coordinates D(1,1) E (7,1) and F(1,5). Show your work.
What is Atlcin’s diet and how does it work?
Give a full description of each of the following career fields; Design, Civil Technology and Sport
Assume that a balloon is spherical shaped. If you have a. Balloon with a radius of 3 cm, what's the volume?
Recalled food should be separated from food being served until they are
Mechanical forces that produce tissue trauma would be classified as which type of cellular injury?
Two mechanics worked on a car. The first mechanic worked for 15 hours, and the second mechanic worked for 5 hours. Together they charged a total of $1800
Which character relationship in The Tempest is the best representation of linguistic imperialism? A. Prospero and Caliban B. Boatswain and Gonzalo C.
trigonometry is the study of tree-dimensional objects true or false