12 workers can do a peice of work in 20 days. How many workers should be added to complete work in 16 days?​

Respuesta :

atchleyamirah69
atchleyamirah69 atchleyamirah69
  • 01-04-2021
3 workers

if 12 workers can do a piece of work in 20 days, then one person can do it in 240 days. 240/16 is 15. That is the number of workers that you need in total to it in 16 days. Since the question ask how many more workers,
15 - 12 = 3 more workers.
Answer Link

Otras preguntas

Alicia estimates that the surface area of a rectangular prism with a length of 11 meters,a width of 5.6 meters,and a height of 7.2 meters is about 334 cubic met
which state of matter has the least amount of energy?
How many atoms are in 0.750 moles of zinc?
Does every point lie in a quadrant?
What are the 3 features of a typical seigneurie
What are the 3 features of a typical seigneurie
Find all powers of 4 in range 4 through 1,000
How do scientists use seismic waves to determine the interior structure of Earth?
How do you Factor c(squared)-8c ??
Which of the following statements is true concerning LUCA? (1) LUCA was a cell. (2) All life on Earth evolved from LUCA. (3) LUCA probably existed probably arou