maaf34nb8f maaf34nb8f
  • 01-04-2021
  • Engineering
contestada

A short framing member that fills the space
between the rough sill and the soleplate is a

Respuesta :

iBear25k
iBear25k iBear25k
  • 01-04-2021

A short framing member that fills the space between the rough sill and the soleplate is a cripple stud.

(HAVE A GOOD DAY!!!)

Answer Link

Otras preguntas

What are some of the challenges in fighting superbugs?
Triple Alliance or Triple Entente controlled the seas surrounding Eroupe
What was the immediate result of the Big Bottom Massacre of 1791?
Gunpowder was brought to europe during the crusades. what advantage did it give european explorers over the natives in lands they were exploring
7 bottle of wine is equal to how many beers
which candidate in the presidential election of 1912 formed the bull moose party
A sawmill runs for three 4-hour shifts per day. It produces 500 2x4's per hour, which are divided into 50 piece bundles automatcally. If a forklift operator is
Find an acute angle whose sine is 0.52
How many turns should a 10-cm long solenoid have if it is to generate a 1.5 x 10-3 t magnetic field on 1.0 a of current?
Help? Sandra walks two miles in 34 minutes, and she runs two miles in 22 minutes. Which of the following equations can be used to calculate how long it takes he