Karenbrph7391 Karenbrph7391
  • 04-06-2021
  • Mathematics
contestada

For a process, the average range for all samples was 5 and the process average was 25. If the sample size was 10, calculate UCL for the R-chart.

Respuesta :

fichoh
fichoh fichoh
  • 07-06-2021

Answer:

8.885

Step-by-step explanation:

Given that :

Sample size, n = 10

The average range, Rbar for all samples = 5

The upper control limit, UCL for the R-chart is :

UCL L= D4Rbar

From the control chart constant table, D4 = 1.777

Hence,

UCL = 1.777 * 5

UCL = 8.885

The UCL for the R-chart is 8.885

Answer Link

Otras preguntas

Why does steam at 100°c give severe burn than water at 100 c?​
NEED HELP FAST VERY VERY FAST!!!
i need help:(...pls do it correctly so i could rate you 5 and thank u:)
(HELPP)In the figure below, AE BD and BD bisects ∠EBC​
Please help me with these two questions I am having trouble
why do u think the shark might pretend to take no interest until you get in his range?
Amad wants to use the following text in a multimedia presentation. Fast food is associated with high caloric intake and poor diet quality. People choose fast fo
How many air conditioning units can Germany produce if it builds 6,00 railroad engines?
Punctuation WorksheetDirections: Punctuate the following excerpts and correct capitalization where necessary.1. She looked surprised she said your garden must b
Write an algebraic expression for the perimeter