Victoriacaulder4
Victoriacaulder4 Victoriacaulder4
  • 04-10-2021
  • History
contestada

What are the risks involved in choosing to build within one kilometer of a site such as Teotihuacan?

Respuesta :

zarampa
zarampa zarampa
  • 04-10-2021

Answer:

Explanation:

The risk is the cancellation of construction due to the high possibility of an anthropological find.

Another risk is the protests of people who feel offended by an alleged invasion of an ancestral territory.

Answer Link

Otras preguntas

Find the original cost of a rocker selling for $159.95 at 20% off.
What's 45 out of 58 in percentage?
16x^2-24x+7=0 equation and/or inequalities
If 604-72=___,then 532+___=604.Explain the process of checking your work.
If every positive number has two square roots and you can find the length of the side of a square window by finding a square root of the area, why is there only
What is square root of 126 + square root of 56 in standard form
Solve the equation x=x+3
How many magnesium ions are present in 5.36 x 10-4 mol of magnesium iodide?
If -2(3y+5)=-4, find the value of 5y
what is 69/25 as a terminating decimal