a piece of work can be finished in 8 days, what part of the work is done in 2 days​

Respuesta :

kaseyafa
kaseyafa kaseyafa
  • 03-02-2022

Answer:

1/4 of the work

Step-by-step explanation:

A quarter (1/4) of the work is done in 2 days. Let's break it down:

Work can be finished in 8 days total so with 2 days it is only partially completed. If we set it up as 2/8 we can simplify to get 1/4. Therefore, we know only a quarter of the work is done so far.

Answer Link

Otras preguntas

A ball is thrown into the air with an upward velocity of 44 ft/s. Its height h in feet after t seconds is given by the function [tex]h=-16t ^{2} +44t+9[/tex]. W
reduce 15 1/4 +1 1/2 +3/20 to lowest term.
A certain animal in the zoo has consumed 39 pounds of food in six days. If it continues to eat at the same rate, in how many more days will its total consumptio
What's the value of pi?
how might the history of california have been different if the gold rush had not happened
Okay so I have three tests tomorrow. Haven't even started studying for two of them (Literature and History) but I already know science. How do you all learn 40
What are the positive and negative aspects of a zoo or safari park?
How long does water evaporation take? What factors influence it?
what is the term for the condition where red blood shrivels?
Which decimal is equivalent to 3/8?